15 resultados para Wind Turbine, Energy Storage, Voltage, SimPower Systems, MATLAB

em Instituto Politécnico do Porto, Portugal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the energy management of the isolated operation of small power system, the economic scheduling of the generation units is a crucial problem. Applying right timing can maximize the performance of the supply. The optimal operation of a wind turbine, a solar unit, a fuel cell and a storage battery is searched by a mixed-integer linear programming implemented in General Algebraic Modeling Systems (GAMS). A Virtual Power Producer (VPP) can optimal operate the generation units, assured the good functioning of equipment, including the maintenance, operation cost and the generation measurement and control. A central control at system allows a VPP to manage the optimal generation and their load control. The application of methodology to a real case study in Budapest Tech, demonstrates the effectiveness of this method to solve the optimal isolated dispatch of the DC micro-grid renewable energy park. The problem has been converged in 0.09 s and 30 iterations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In many countries the use of renewable energy is increasing due to the introduction of new energy and environmental policies. Thus, the focus on the efficient integration of renewable energy into electric power systems is becoming extremely important. Several European countries have already achieved high penetration of wind based electricity generation and are gradually evolving towards intensive use of this generation technology. The introduction of wind based generation in power systems poses new challenges for the power system operators. This is mainly due to the variability and uncertainty in weather conditions and, consequently, in the wind based generation. In order to deal with this uncertainty and to improve the power system efficiency, adequate wind forecasting tools must be used. This paper proposes a data-mining-based methodology for very short-term wind forecasting, which is suitable to deal with large real databases. The paper includes a case study based on a real database regarding the last three years of wind speed, and results for wind speed forecasting at 5 minutes intervals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wind resource evaluation in two sites located in Portugal was performed using the mesoscale modelling system Weather Research and Forecasting (WRF) and the wind resource analysis tool commonly used within the wind power industry, the Wind Atlas Analysis and Application Program (WAsP) microscale model. Wind measurement campaigns were conducted in the selected sites, allowing for a comparison between in situ measurements and simulated wind, in terms of flow characteristics and energy yields estimates. Three different methodologies were tested, aiming to provide an overview of the benefits and limitations of these methodologies for wind resource estimation. In the first methodology the mesoscale model acts like “virtual” wind measuring stations, where wind data was computed by WRF for both sites and inserted directly as input in WAsP. In the second approach, the same procedure was followed but here the terrain influences induced by the mesoscale model low resolution terrain data were removed from the simulated wind data. In the third methodology, the simulated wind data is extracted at the top of the planetary boundary layer height for both sites, aiming to assess if the use of geostrophic winds (which, by definition, are not influenced by the local terrain) can bring any improvement in the models performance. The obtained results for the abovementioned methodologies were compared with those resulting from in situ measurements, in terms of mean wind speed, Weibull probability density function parameters and production estimates, considering the installation of one wind turbine in each site. Results showed that the second tested approach is the one that produces values closest to the measured ones, and fairly acceptable deviations were found using this coupling technique in terms of estimated annual production. However, mesoscale output should not be used directly in wind farm sitting projects, mainly due to the mesoscale model terrain data poor resolution. Instead, the use of mesoscale output in microscale models should be seen as a valid alternative to in situ data mainly for preliminary wind resource assessments, although the application of mesoscale and microscale coupling in areas with complex topography should be done with extreme caution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Ao longo dos últimos anos tem-se assistido a um forte desenvolvimento e crescimento do número de parques eólicos instalados no mundo, o que leva a que seja necessário o incremento de ferramentas que permitam aperfeiçoar os sistemas de monitorização e controlo atualmente existentes. Por outro lado, não se deve deixar de ter em conta os custos elevados de operação e manutenção dos sistemas eólicos bem como o facto de os aerogeradores estarem localizadas em locais remotos ou offshore, o que faz aumentar os custos associados à sua exploração. A dissertação nasce da intenção clara do mercado em apostar na supervisão e previsão de avarias graves, de forma a minimizar os encargos subjacentes. Este trabalho de dissertação visa a utilização de redes neuronais para criar uma ferramenta informática de previsão de avarias em caixas de engrenagens em aerogeradores. As redes neuronais são ferramentas informáticas ideais para trabalhar com muita informação, sendo que a sua aplicação depende da qualidade e quantidade dos dados. Para tal irá ser efetuado um estudo em um parque eólico, no qual se analisará as principais avarias detetadas bem como as grandezas que deverão integrar a construção desta rede neuronal. Assim sendo, a informação relativa às diversas máquinas existentes num parque, é de enorme importância para a definição e otimização da rede neuronal a construir. Os resultados obtidos neste trabalho com a aplicação de redes neuronais para a previsão de avarias em caixas de engrenagens do parque eólico de estudo, provam que é possível realizar uma deteção da avaria bem como uma constatação de que a reparação possa ter sido bem efetuada ou mal sucedida, podendo assim ser ajustados os programas de manutenção a efetuar e uma verificação das ações de reparação para sua validação.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The deregulation of electricity markets has diversified the range of financial transaction modes between independent system operator (ISO), generation companies (GENCO) and load-serving entities (LSE) as the main interacting players of a day-ahead market (DAM). LSEs sell electricity to end-users and retail customers. The LSE that owns distributed generation (DG) or energy storage units can supply part of its serving loads when the nodal price of electricity rises. This opportunity stimulates them to have storage or generation facilities at the buses with higher locational marginal prices (LMP). The short-term advantage of this model is reducing the risk of financial losses for LSEs in DAMs and its long-term benefit for the LSEs and the whole system is market power mitigation by virtually increasing the price elasticity of demand. This model also enables the LSEs to manage the financial risks with a stochastic programming framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing and intensive integration of distributed energy resources into distribution systems requires adequate methodologies to ensure a secure operation according to the smart grid paradigm. In this context, SCADA (Supervisory Control and Data Acquisition) systems are an essential infrastructure. This paper presents a conceptual design of a communication and resources management scheme based on an intelligent SCADA with a decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). The methodology is used to support the energy resource management considering all the involved costs, power flows, and electricity prices leading to the network reconfiguration. The methodology also addresses the definition of the information access permissions of each player to each resource. The paper includes a 33-bus network used in a case study that considers an intensive use of distributed energy resources in five distinct implemented operation contexts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traditional vertically integrated power utilities around the world have evolved from monopoly structures to open markets that promote competition among suppliers and provide consumers with a choice of services. Market forces drive the price of electricity and reduce the net cost through increased competition. Electricity can be traded in both organized markets or using forward bilateral contracts. This article focuses on bilateral contracts and describes some important features of an agent-based system for bilateral trading in competitive markets. Special attention is devoted to the negotiation process, demand response in bilateral contracting, and risk management. The article also presents a case study on forward bilateral contracting: a retailer agent and a customer agent negotiate a 24h-rate tariff.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A presente tese descreve diferentes soluções que permitem a reutilização da energia recuperada em ascensores eléctricos de roda de aderência dotados de conversores electrónicos de frequência e dessa forma contribuir para a melhoria da eficiência energética nos ascensores. Nos ascensores, a energia potencial é constantemente transferida enquanto a cabina está em movimento. Se a cabina se estiver a movimentar em sentido descendente com plena carga, ou em sentido ascendente, mas vazia, o motor estará em modo gerador. Quando a cabina se movimenta em sentido descendente, e o peso na cabina é superior ao peso do contrapeso, então o binário do motor encontra-se em sentido contrário à velocidade, isto é, o motor está a travar, havendo lugar à recuperação de energia. Igualmente, se a cabina subir vazia, também se poderá recuperar energia eléctrica. A energia acumulada em forma de energia potencial nas pessoas e no contrapeso pode ser recuperada, dado que o motor estará a funcionar como um gerador. De modo a estudar a viabilidade técnica e económica das diferentes soluções foram realizadas medições a uma amostra representativa de ascensores eléctricos de roda de aderência. Esta amostra é constituída por 39 ascensores que estão instalados em diferentes tipos de edifícios e que pertencem a diferentes categorias de utilização, de acordo com a norma VDI 4707:2009. Para cada ascensor foi medida a energia consumida e a energia gerada para uma manobra completa – a descida e a subida da cabina sem carga. A partir das medições, e com base na norma VDI 4707:2009 foram calculados os valores anualizados de energia eléctrica consumidos e produzidos por cada ascensor. A partir das 5 hipóteses identificadas para a utilização da energia recuperada (carregamento de bateria para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentação dos circuitos em stand-by; carregamento de supercondensador para alimentar o barramento DC; reinjecção da energia no barramento DC de um conjunto de ascensores em grupo; reinjecção da energia na rede eléctrica do edifício onde o ascensor está instalado) foi realizada a avaliação técnica e a avaliação económico-financeira para cada um dos ascensores. Por último, foi desenvolvido um simulador que permite definir a solução de recuperação de energia que seja técnica e economicamente mais viável, para um dado ascensor eléctrico de roda de aderência instalado, mediante a introdução dos parâmetros técnicos do ascensor em avaliação.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Por um lado vivemos numa sociedade cujos padrões de conforto são cada vez mais exigentes, por outro encontramo-nos numa era pautada por um certo declínio económico, social e também ambiental. Não se assumindo uma estratégia que limite ou diminua essas condições de conforto resta-nos atuar de forma a que os recursos utilizados para garantir esse mesmo conforto sejam utilizados da melhor forma possível. O setor dos edifícios é responsável por uma grande parcela de consumo de energia na sociedade atual, sendo que os sistemas de climatização que dele fazem parte, apresentam.se na maioria dos casos como os grandes consumidores de energia. Nesse sentido têm sido feitos esforços enormes no sentido de encontrar soluções que garantam a eficiência energética destes sistemas. O Variador Eletrónico de Velocidade apresenta-se como uma das soluções amplamente difundidas, na vertente do controle de processos e economia de energia. A sua aplicação em sistema de climatização é mais um desses casos. Nesse sentido, numa primeira parte é feito o estudo das características e funcionamento dos Variadores de Velocidade, Sistemas de Climatização e sua aplicação conjunta. Em seguida é realizada uma aplicação informática que pretende demonstrar a economia de energia garantida por aplicação de um Variador de Velocidade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

De forma a não comprometer o conforto ou a qualidade de vida, nos dias de hoje, é obrigatório que a energia elétrica esteja presente. Sendo indispensável, torna-se necessário assegurar que a sua distribuição seja feita da forma mais qualitativa possível. Uma resposta rápida e eficaz a possíveis falhas que ocorram na rede, irá garantir a tal qualidade de serviço desejada. Para isso, a automatização dos processos é uma grande evolução e objetivo de concretização do setor elétrico. Neste contexto surge o conceito de Smart Grid, que tem como principal objetivo a combinação entre o setor elétrico e a evolução da tecnologia. A par desta característica, estes tipos de redes vêm também trazer evoluções no âmbito ambiental, pois a produção de energia elétrica é feita, maioritariamente, por fontes de energia renovável. Este projeto incide na análise das vantagens técnicas e económicas da inclusão de equipamentos que detêm capacidades de armazenamento de energia, as Baterias de Armazenamento de Energia (BAE), neste tipo de redes. Para tal, procedeu-se à utilização do método do Despacho Económico, que tem como principal objetivo a determinação dos níveis de produção de todas as unidades geradoras do sistema, satisfazendo a carga, ao mais baixo custo de produção. Com este método, foram criados vários cenários de estudo com vista a validar todo o propósito deste projeto. Nesta dissertação, é também realizado um estudo de viabilidade económica destes equipamentos de armazenamento de energia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Em 2006, a IEA (Agência Internacional de Energia), publicou alguns estudos de consumos mundiais de energia. Naquela altura, apontava na fabricação de produtos, um consumo mundial de energia elétrica, de origem fóssil de cerca 86,16 EJ/ano (86,16×018 J) e um consumo de energia nos sistemas de vapor de 32,75 EJ/ano. Evidenciou também nesses estudos que o potencial de poupança de energia nos sistemas de vapor era de 3,27 EJ/ano. Ou seja, quase tanto como a energia consumida nos sistemas de vapor da U.E. Não se encontraram números relativamente a Portugal, mas comparativamente com outros Países publicitados com alguma similaridade, o consumo de energia em vapor rondará 0,2 EJ/ano e por conseguinte um potencial de poupança de cerca 0,02 EJ/ano, ou 5,6 × 106 MWh/ano ou uma potência de 646 MW, mais do que a potência de cinco barragens Crestuma/Lever! Trata-se efetivamente de muita energia; interessa por isso perceber o onde e o porquê deste desperdício. De um modo muito modesto, pretende-se com este trabalho dar algum contributo neste sentido. Procurou-se evidenciar as possibilidades reais de os utilizadores de vapor de água na indústria reduzirem os consumos de energia associados à sua produção. Não estão em causa as diferentes formas de energia para a geração de vapor, sejam de origem fóssil ou renovável; interessou neste trabalho estudar o modo de como é manuseado o vapor na sua função de transporte de energia térmica, e de como este poderá ser melhorado na sua eficiência de cedência de calor, idealmente com menor consumo de energia. Com efeito, de que servirá se se optou por substituir o tipo de queima para uma mais sustentável se a jusante se continuarem a verificarem desperdícios, descarga exagerada nas purgas das caldeiras com perda de calor associada, emissões permanentes de vapor para a atmosfera em tanques de condensado, perdas por válvulas nos vedantes, purgadores avariados abertos, pressão de vapor exageradamente alta atendendo às temperaturas necessárias, “layouts” do sistema de distribuição mal desenhados, inexistência de registos de produção e consumos de vapor, etc. A base de organização deste estudo foi o ciclo de vapor: produção, distribuição, consumo e recuperação de condensado. Pareceu importante incluir também o tratamento de água, atendendo às implicações na transferência de calor das superfícies com incrustações. Na produção de vapor, verifica-se que os maiores problemas de perda de energia têm a ver com a falta de controlo, no excesso de ar e purgas das caldeiras em exagero. Na distribuição de vapor aborda-se o dimensionamento das tubagens, necessidade de purgas a v montante das válvulas de controlo, a redução de pressão com válvulas redutoras tradicionais; será de destacar a experiência americana no uso de micro turbinas para a redução de pressão com produção simultânea de eletricidade. Em Portugal não se conhecem instalações com esta opção. Fabricantes da República Checa e Áustria, têm tido sucesso em algumas dezenas de instalações de redução de pressão em diversos países europeus (UK, Alemanha, R. Checa, França, etc.). Para determinação de consumos de vapor, para projeto ou mesmo para estimativa em máquinas existentes, disponibiliza-se uma série de equações para os casos mais comuns. Dá-se especial relevo ao problema que se verifica numa grande percentagem de permutadores de calor, que é a estagnação de condensado - “stalled conditions”. Tenta-se também evidenciar as vantagens da recuperação de vapor de flash (infelizmente de pouca tradição em Portugal), e a aplicação de termocompressores. Finalmente aborda-se o benchmarking e monitorização, quer dos custos de vapor quer dos consumos específicos dos produtos. Esta abordagem é algo ligeira, por manifesta falta de estudos publicados. Como trabalhos práticos, foram efetuados levantamentos a instalações de vapor em diversos sectores de atividades; 1. ISEP - Laboratório de Química. Porto, 2. Prio Energy - Fábrica de Biocombustíveis. Porto de Aveiro. 3. Inapal Plásticos. Componentes de Automóvel. Leça do Balio, 4. Malhas Sonix. Tinturaria Têxtil. Barcelos, 5. Uma instalação de cartão canelado e uma instalação de alimentos derivados de soja. Também se inclui um estudo comparativo de custos de vapor usado nos hospitais: quando produzido por geradores de vapor com queima de combustível e quando é produzido por pequenos geradores elétricos. Os resultados estão resumidos em tabelas e conclui-se que se o potencial de poupança se aproxima do referido no início deste trabalho.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dadas as condições actuais do mercado de trabalho, o conhecimento empírico é cada vez mais um factor distintivo na carteira de habilitações de um engenheiro recém-graduado. Desta forma, a possibilidade de realização de um estágio em ambiente empresarial ganha toda uma nova dimensão no panorama académico, apresentando-se como uma excelente oportunidade de obtenção de experiência e conhecimento de causa num momento imediatamente anterior à saída da universidade e à entrada no mundo profissional. Neste âmbito, apresenta-se o presente relatório, referente ao estágio desenvolvido sob alçada da empresa Electrolinhas S. A. durante a construção do Parque Eólico do Pisco. Este estágio enquadra-se no 2º Ano do Mestrado em Engenharia Civil – ramo de Infraestruturas, do departamento de Engenharia Civil do Instituto Superior de Engenharia do Porto. Ao longo de 6 meses, de Fevereiro a Julho de 2015, foi possível acompanhar o desenrolar da obra de construção de um parque eólico, da perspectiva da fiscalização. Este estágio tem especial interesse dado tratar-se de uma obra de grande dimensão, com diversas particularidades ao nível do planeamento e da execução, descritas ao longo dos próximos capítulos.