2 resultados para MCQ, Multiple Choice Tests, Marking Scheme, Negative Marking, On-line Teaching

em Greenwich Academic Literature Archive - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a proactive approach to load sharing and describes the architecture of a scheme, Concert, based on this approach. A proactive approach is characterized by a shift of emphasis from reacting to load imbalance to avoiding its occurrence. In contrast, in a reactive load sharing scheme, activity is triggered when a processing node is either overloaded or underloaded. The main drawback of this approach is that a load imbalance is allowed to develop before costly corrective action is taken. Concert is a load sharing scheme for loosely-coupled distributed systems. Under this scheme, load and task behaviour information is collected and cached in advance of when it is needed. Concert uses Linux as a platform for development. Implemented partially in kernel space and partially in user space, it achieves transparency to users and applications whilst keeping the extent of kernel modifications to a minimum. Non-preemptive task transfers are used exclusively, motivated by lower complexity, lower overheads and faster transfers. The goal is to minimize the average response-time of tasks. Concert is compared with other schemes by considering the level of transparency it provides with respect to users, tasks and the underlying operating system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two-machine problem is NP-hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst-case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple-choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008