5 resultados para Software de aplicação

em Repositório Institucional da Universidade Estadual de São Paulo - UNESP


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Through a current and practical approach, this work aims to demonstrate how a speed reducer would behave in a real situation, but using a digital environment. Therefore, first, it was made the modeling of each component of the reducer, driven by gears. Completed the modeling of the components, it was possible to realize the connection between them and thus characterize the work as a speed reducer; and using properly sized and shaped reducer, we could finally demonstrate the operation of the same, the very Autodesk Inventor ™ 2014 environment

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Global competitiveness has been increased significantly in the last decade and, as consequence, companies are always looking for developing better processes in supply chain operations in order to maintain their competitive costs and keep themselves in the business. Logistics operations represent a large part of the product's final cost. Transportation can represent more than fifty percent of final cost sometimes. The solutions for cutting and packing problems consist in simple and low investment actions, as enhancing the arrangement of the transported load in order to decrease both material and room wastes. As per the presented reasons, the objective of this paper is to show and analyze a real application of a mathematical model to solve a manufacturer pallet-loading problem, comparing results from the model execution and the solution proposed by the company studied. This study will not only find the best arrangement to load pallets (which will optimize storage and transportation process), but also to check the effectiveness of existing modeling in the literature. For this study a computational package was used, which consists of a modeling language GAMS with the CPLEX optimization solver and two other existing software in the market, all of them indicating that an accurate mathematical model for solving this kind of problem in a two-dimensional approach is difficult to be found, in addition to a long execution time. However, the study and the software utilization indicate that the problem would be easily solved by heuristics in a shorter execution time

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work, the author looks forward to develop a new method capable of incorporate the concepts of the Reliability Theory and Ruin Probability in Deep Foundations, in order to do a better quantification of the uncertainties, which is intrinsic in all geotechnical projects, meanly because we don't know all the properties of the materials that we work with. Using the methodologies of Decourt Quaresma and David Cabral, resistance surfaces have been developed utilizing the data achieved from the Standard Penetration Tests performed in the field of study, in conjecture with the loads defined in the executive project of the piles. The construction of resistance surfaces shows to be a very useful tool for decision making, no matter in which phase it is current on, projecting or execution. The surfaces were developed by Kriging (using the software Surfer® 12), making it easier to visualize the geotechnical profile of the field of study. Comparing the results, the conclusion was that a high safety factor doesn't mean higher security. It is fundamental to consider the loads and resistance of the piles in the whole field, carefully choosing the project methodology responsible to define the diameter and length of the piles

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The automobile industry shows relevance inside the Brazilian industrial scenario since it contributes with the development of a significant chain of supply, distributors, workshops, publicity agencies and insurance companies in the internal market, aside from being one of the five biggest worldwide market. Thereby, the federal government decreed in Dec, 17th 2012 by Law nº 12.715 the Inovar-Auto Program. As the Adjusted Present Value (APV) is highly recommended, although not yet widespread to public politics of tax reduction, this work intends to apply the APV method on the cash flow analysis of an automobile sector's company, which has recently installed in national territory and wants to rely with governmental incentives proposed by Inovar-Auto Program. The developed work evaluates the company's current cash flow stochastically from mathematical modeling of variables such as price, demand and interest rate through probability distributions with the assist of Crystal Ball software, a Microsoft Excel Add-in, generating different scenarios from Monte Carlo Simulation. As results probabilities situations have been evaluated until the end of the Inovar-Auto's conducted period, in 2017. Beside APV others indicator such as Internal Rate of Return (IRR) and payback period were estimated for the investment project. For APV a sampling distribution with only 0.057% of risk, IRR of 29% were obtained and estimated project payback period was 4.13 years

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies