3 resultados para Esgotos sanitários

em Repositório Institucional da Universidade Tecnológica Federal do Paraná (RIUT)


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main issues related to water conservation in urban centers are the increase in water supply cost, demand growth, pollution and differences in the distribution of water resources. Water conservation, the controlled and efficient use of water, includes both measures as reasonable means of water reuse. Thus, conservation practices are an effective way to meet demand and supply water to new activities and users without jeopardizing the supplying water bodies and preserving the natural environment. This study aims to examine the water management of a shopping mall and the use of rainwater harvesting combined with greywater reuse. For buildings in general, water loss is common due to leaks in the hydraulic and restroom equipment. These losses, which are caused by a high volume of water used and wasted in the system, are often the result of design errors, incorrect maintenance procedures and users' bad habits In southern Brazil, where there is rainfall almost all year long, water shortages occasionally occur, particularly in some winter mouths. One difficulty that appears on rainwater studies is the proper determination of rainwater volume that can be used to address water supply systems. In this work, the simulation method was used to determine this volume. Thus, simulations with the following variables: rainfall, catchment area and water consumption were performed. For mall's hydraulic systems, segmented alternatives are adopted. That is, focusing on the use of rainwater or greywater reuse. Other alternatives of effluent reuse have been slightly discussed due to sanitary issues, those are effluents from toilets and kitchen sinks. The adoption of greywater may be feasible if there is a significant flow of greywater to comply water demand for toilet flushing. The inspections made in this study found that the quantity of sinks was insufficient to supply an adequate amount of water to toilets and urinals. The greywater reuse system was found to be infeasible in terms of demand and supply of water. Conversely, the rainwater harvesting system was entirely feasible and easily supplied water to all restrooms and contributed to the cooling of the air conditioning system with a short payback period. One of the challenges of this work was the need to compare the actual water consumption with a water consumption parameter used in buildings. Thus, a method that addresses the generation of specific consumption indexes for specific activity (like a mall) was used. The water consumption indices showed that this mall has a satisfactory water management program.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The release of nitrogen compounds in water bodies can result in many environmental problems, so treat wastewater, such as sewage in order to remove not only organic matter but also nitrogen has been studied a few decades. From the above, the objective of this study was to evaluate the performance of a structured bed reactor, continuous flow, with recirculation, in removing organic matter and nitrogen present in wastewater under different cycles of intermittent aeration (AI) and to evaluate the influence of these cycles in the development of nitrifying bacteria (Oxidizing Bacteria Ammonia - BOA and Bacteria Oxidizing Nitrite - BON) and denitrifying (DESN) adhered (Support Material - MS) and suspension (Effluent - EF and sludge - LD). The reactor used has usable volume of 9.4 L. As support materials (MS) polyurethane foam was used, cut and fixed in PVC rods. 3 were worked aeration phases (AE) and non-aeration (AN) at different stage: Stage 1 (4 h EA / AN 2H); Stage 2 (2H EA / AN 1 h) and Phase 3 (2H EA / AN 2 h). During all hydraulic detention time phases was kept at 16 h and the effluent recirculated at a rate of 3 times the inflow. Were analyzed: pH, total alkalinity, temperature, chemical oxygen demand (COD), Biochemical Oxygen Demand (BOD), nitrogen Kjeldhl Total (NKT), ammonia-N-N-NH4+, nitrito-N-NO2+andnitrato-NO3-. The concentration of BOA, BON and DESN was determined using the number More Provável.gSSV-1 (NMP.gSSV-1). In phase 1 the percentage removal NTK N-NH4+ and NT was 76±10%, 70±21% and 67±10% respectively. In Phase 2 80±15% of removel NKT, 86±15% of N-NH4+ e 68±9% of removel NT e na Fase 3 de 58±20%, 72±28% and 41±6% of NKT, N-NH4+ of NT, respectively. The denitrification efficiency in stage 3 was over 70%, indicating that occurred in the reactor the process of simultaneous nitrification and denitrification (NDS). DQOT the removal percentages were 88 ± 4% in Phase 1, 94 ± 7 in Phase 2 and 90± 11% in Phase 3. The multivariate ANOVA applied to NMP.gSSV-1, it indicated that there was significant (F: 20,2, p <0,01) between the analyzed concentration of organisms AI in different cycles, but the differences between NMP.gSSV-1 depends not only isolated factors but of which means, and phase groups being analysis. From the results it is concluded that the working system is efficient in terms of nitrogen removal and organic matter, and that the stage with the highest availability of Dissolved Oxygen (DO) and C/N ratio (Step 2), was the one obtained the lower concentrations of organic matter effluents and N-NH4+. Hinted that there was a significant difference between the concentration (NMP.100mL-1) of the analyzed organizations (BOA, BON and DESN), but this difference does not depend on factors alone but of which means (MS, EF or LD), stages (1, 2 or 3) and groups (BOA, BON and DESN) is being considered.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

One of the biggest environmental problems of the population is the lack of sewage treatment, especially in rural communities and low-income. The development of technologies for efficient, low-cost sanitation need to be developed to meet the disadvantaged people of this basic service. This work was the implementation proposal of a technology called constructed wetlands, also known as Wastewater Treatment Plant for Roots Zone - ETEZR. The objective was to develop a non- formal environmental education proposal for redevelopment, using outreach methods for residents and deployment of this technology ETEZR in the rural community of Cologne Grebe in Sao Jose dos Pinhais - PR. With technical support from the Paranaense Technical Assistance and Rural Extension Institute -EMATER and the Federal Technological University of Paraná - UTFPR, 5 ETEZR were deployed in the colony through three theoretical and practical workshops, which involved total 67 people from the community 5 technicians EMATER and 13 of the Municipal Town Hall. Após4 months of implementation were carried out two collections of raw wastewater and treated to analyze physical, chemical and biological parameters. The results evaluated by chemical parameters BOD, COD, phosphorus, ammonia nitrogen comparing raw and treated sewage, demonstrate that ETEZR are effective in the treatment of sewage. 5 Seasons minimum and maximum efficiency between the basic parameters analyzed were 52.2 to 95.5% for BOD; 47 to 94.5% for COD; 21.5 to 96% phosphorus; 30-98% for ammonia nitrogen. Oils and greases, and a series of solid also achieved a significant reduction in their values when comparing the raw sewage and treated sewage, and biological parameters evaluated by means of coliforms showed a reduction of 80 to 99%. With the implementation of environmental education process aimed sanitation was possible to evaluate the perception of the population to accept the environmental sanitation technology using the ETEZR, understand the needs and sanitation concepts for the community. This research evaluated the development of the methodology applied by the non-formal environmental education in order to provide subsidies for rural sanitation plan process for the municipality.