192 resultados para Industrial productivity
em Queensland University of Technology - ePrints Archive
Resumo:
The issue of whether improved building services such as air quality, provision of daylight, thermal comfort etc, have a positive impact on the health and productivity of building occupants is still an open question. There is significant anecdotal evidence supporting the notion that health and productivity of building occupants can be improved by improving the quality of the indoor environment, but there are actually few published quantitative studies to substantiate this contention. This paper reports on a comprehensive review of the worldwide literature which relates health of building occupants with the different aspects of the indoor environment which are believed to impact of these issues, with a particular focus on studies in Australia, The paper analyses the existing research and identifies the key deficiencies in our existing understanding of this problem. The key focus of this research is office and school buildings, but the scope of the literature surveyed includes all commercial buildings, including industrial buildings. There is a notable absence of detailed studies on this link in Australian buildings, although there are studies on thermal comfort, and a number of studies on indoor air quality in Australia, which do not make the connection to health and productivity. Many international studies have focused on improved lighting, and in particular the provision of daylight in buildings, but again there are few studies in Australia which focus in this area.
Resumo:
There is a large and growing body of research to show that human resource (HR) practices affect individual performance, organisational productivity and organisational performance. Academic findings about effective HR practices, however, have not readily been adopted by practitioners. A variety of theoretical and practical explanations have been advanced about the research-practice gap. Research by Rynes, Colbert, and Brown (2002) suggested that the research-practice gap is due to a lack of knowledge, but the extent to which these findings apply to the Australian context is unknown. The sample consisted of 102 industrial/organisational (I/O) psychologists and 89 HR practitioners. The main aim of the present study was to replicate and extend the work of Rynes et al. by examining and comparing the knowledge of I/O psychologists and HR practitioners. It was found that overall I/O psychologists were better informed about HR research than HR practitioners; in particular, they were more knowledgeable about management practices and recruitment and selection. In both groups, of the five content areas examined (Management Practices; General Employment Practices; Training and Development; Recruitment and Selection; and Compensation and Benefits), the greatest gaps were in Recruitment and Selection.
Resumo:
Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.
Resumo:
New technical and procedural interventions are less likely to be adopted in industry, unless they are smoothly integrated into the existing practices of professionals. In this paper, we provide a case study of the use of ethnographic methods for studying software bug-fixing activities at an industrial engineering conglomerate. We aimed at getting an in-depth understanding of software developers' everyday practices in bug-fixing related projects and in turn inform the design of novel productivity tools. The use of ethnography has allowed us to look at the social side of software maintenance practices. In this paper, we highlight: 1) organizational issues that influence bug-fixing activities; 2) social role of bug tracking systems, and; 3) social issues specific to different phases of bug-fixing activities.
Resumo:
This study analyzes Total Factor Productivity (TFP), which includes all categories of productivity. Our measure investigates productivity in the context of the provision and dissemination of environmental information policies. We investigated data on the emission of toxic chemical substances for the U.S. and Japanese manufacturing firms, including 386 firms for the period 1999-2007 and 466 firms for the period 2001-2008. The results show that productivity improved in all nine industrial sectors and that pollution levels were high in the U.S. and Japan from 2001 to 2007. In particular, the electronics industry improved rapidly after 2002 in both countries, which may be attributed to the enforcement of RoHS and the REACH directive in Europe. As a result of these stringent policies on toxic chemical emissions, the U.S. and Japanese firms, many of which export to the European market, have strong incentives to reduce their toxic chemical emissions.
Resumo:
Problem of water scarcity has been increasingly severe in China. Though industrial sectors play important role for the rapid economic growth, and they consumes water and discharge wastewater. The purpose of this study is to examine the efficiency of water use and wastewater discharge in comparison with those of other inputs and production output in Chinese industry. Measuring efficiency of each input and output factor from 2002 to 2008, we find the average inefficiencies of industrial water use and industrial wastewater discharge are higher than those of capital, labor, and production output in China. In addition, the productivity levels to save water in the water shortage areas are not higher compared to the others. The water use inefficiency has a high dispersion especially in the regions where the amounts of water resources per capita is less than 3000 cubic meter.
Development of Thermally Comfortable Industrial Buildings with Effective Use of Computer Simulations