15 resultados para SCHEDULES

em Indian Institute of Science - Bangalore - Índia


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The responses of the field mouse Mus booduga to shifts in schedules of LD cycles were monitored and the results were interpreted with the help of a PRC constructed for the same species. The results reveal that, M. booduga reentrained faster with a lesser number of transients after delay shifts than advance shifts, thus exhibiting “asymmetry effect.” A positive correlation was observed between the number of transients and the number of hours of shift. In most of the shifts, the sign of the transients (negative for delaying transients and positive for advancing transients) coincided with the direction of the shift. Interestingly, 11 and 12 h of advance shifting resulted in delaying transients. An 11-h advance shift can also be interpreted as a 13-h delay. Reentrainment through delaying transients is faster as compared to reentrainment through advancing transients. Thus, this animal might have taken a “shorter route,” as proved by the fact that an 11-h advance shift has evoked delaying transients. But a 13-h advance shift evoked only advancing transients. This prompts us to speculate that there may be a “phase jump” in M. booduga. Further, irrespective of whether L or D has been doubled in a 12-h shift, both evoked only delaying transients.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Absenteeism is one of the major problems of Indian industries. It necessitates the employment of more manpower than the jobs require, resulting in the increase of manpower costs, and lowers the efficiency of plant operation through lowered performance and higher rejects. It also causes machine idleness, if extra manpower is not hired, resulting in disrupted work schedules and assignments. Several studies have investigated the causes of absenteeism (Vaid 1967) for example and their remedy and relationship between absenteeism and turnover with a suggested model for diagnosis and treatment (Hawk 1976) However, the production foremen and supervisor will face the operating task of determining how many extra operatives are to be hired in order to stave off the adverse effects of absenteeism on the man-machine system. This paper deals with a class of reserve manpower models based on the reject allowance model familiar in quality control literature. The present study considers, in addition to absenteeism, machine failures and the graded nature of manpower met within production systems and seeks to find optimal reserve manpower through computer simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Although various strategies have been developed for scheduling parallel applications with independent tasks, very little work exists for scheduling tightly coupled parallel applications on cluster environments. In this paper, we compare four different strategies based on performance models of tightly coupled parallel applications for scheduling the applications on clusters. In addition to algorithms based on existing popular optimization techniques, we also propose a new algorithm called Box Elimination that searches the space of performance model parameters to determine the best schedule of machines. By means of real and simulation experiments, we evaluated the algorithms on single cluster and multi-cluster setups. We show that our Box Elimination algorithm generates up to 80% more efficient schedule than other algorithms. We also show that the execution times of the schedules produced by our algorithm are more robust against the performance modeling errors.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Four hybrid algorithms has been developed for the solution of the unit commitment problem. They use simulated annealing as one of the constituent techniques, and produce lower cost schedules; two of them have less overhead than other soft computing techniques. They are also more robust to the choice of parameters. A special technique avoids the generating of infeasible schedules, and thus reduces computation time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we are concerned with energy efficient area monitoring using information coverage in wireless sensor networks, where collaboration among multiple sensors can enable accurate sensing of a point in a given area-to-monitor even if that point falls outside the physical coverage of all the sensors. We refer to any set of sensors that can collectively sense all points in the entire area-to-monitor as a full area information cover. We first propose a low-complexity heuristic algorithm to obtain full area information covers. Using these covers, we then obtain the optimum schedule for activating the sensing activity of various sensors that maximizes the sensing lifetime. The scheduling of sensor activity using the optimum schedules obtained using the proposed algorithm is shown to achieve significantly longer sensing lifetimes compared to those achieved using physical coverage. Relaxing the full area coverage requirement to a partial area coverage (e.g., 95% of area coverage as adequate instead of 100% area coverage) further enhances the lifetime.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider the problem of optimally scheduling a processor executing a multilayer protocol in an intelligent Network Interface Controller (NIC). In particular, we assume a typical LAN environment with class 4 transport service, a connectionless network service, and a class 1 link level protocol. We develop a queuing model for the problem. In the most general case this becomes a cyclic queuing network in which some queues have dedicated servers, and the others have a common schedulable server. We use sample path arguments and Markov decision theory to determine optimal service schedules. The optimal throughputs are compared with those obtained with simple policies. The optimal policy yields upto 25% improvement in some cases. In some other cases, the optimal policy does only slightly better than much simpler policies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Large-grain synchronous dataflow graphs or multi-rate graphs have the distinct feature that the nodes of the dataflow graph fire at different rates. Such multi-rate large-grain dataflow graphs have been widely regarded as a powerful programming model for DSP applications. In this paper we propose a method to minimize buffer storage requirement in constructing rate-optimal compile-time (MBRO) schedules for multi-rate dataflow graphs. We demonstrate that the constraints to minimize buffer storage while executing at the optimal computation rate (i.e. the maximum possible computation rate without storage constraints) can be formulated as a unified linear programming problem in our framework. A novel feature of our method is that in constructing the rate-optimal schedule, it directly minimizes the memory requirement by choosing the schedule time of nodes appropriately. Lastly, a new circular-arc interval graph coloring algorithm has been proposed to further reduce the memory requirement by allowing buffer sharing among the arcs of the multi-rate dataflow graph. We have constructed an experimental testbed which implements our MBRO scheduling algorithm as well as (i) the widely used periodic admissible parallel schedules (also known as block schedules) proposed by Lee and Messerschmitt (IEEE Transactions on Computers, vol. 36, no. 1, 1987, pp. 24-35), (ii) the optimal scheduling buffer allocation (OSBA) algorithm of Ning and Gao (Conference Record of the Twentieth Annual ACM SIGPLAN-SIGACT Symposium on Principles of Programming Languages, Charleston, SC, Jan. 10-13, 1993, pp. 29-42), and (iii) the multi-rate software pipelining (MRSP) algorithm (Govindarajan and Gao, in Proceedings of the 1993 International Conference on Application Specific Array Processors, Venice, Italy, Oct. 25-27, 1993, pp. 77-88). Schedules generated for a number of random dataflow graphs and for a set of DSP application programs using the different scheduling methods are compared. The experimental results have demonstrated a significant improvement (10-20%) in buffer requirements for the MBRO schedules compared to the schedules generated by the other three methods, without sacrificing the computation rate. The MBRO method also gives a 20% average improvement in computation rate compared to Lee's Block scheduling method.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The specified range of free chlorine residual (between minimum and maximum) in water distribution systems needs to be maintained to avoid deterioration of the microbial quality of water, control taste and/or odor problems, and hinder formation of carcino-genic disinfection by-products. Multiple water quality sources for providing chlorine input are needed to maintain the chlorine residuals within a specified range throughout the distribution system. The determination of source dosage (i.e., chlorine concentrations/chlorine mass rates) at water quality sources to satisfy the above objective under dynamic conditions is a complex process. A nonlinear optimization problem is formulated to determine the chlorine dosage at the water quality sources subjected to minimum and maximum constraints on chlorine concentrations at all monitoring nodes. A genetic algorithm (GA) approach in which decision variables (chlorine dosage) are coded as binary strings is used to solve this highly nonlinear optimization problem, with nonlinearities arising due to set-point sources and non-first-order reactions. Application of the model is illustrated using three sample water distribution systems, and it indicates that the GA,is a useful tool for evaluating optimal water quality source chlorine schedules.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As computational Grids are increasingly used for executing long running multi-phase parallel applications, it is important to develop efficient rescheduling frameworks that adapt application execution in response to resource and application dynamics. In this paper, three strategies or algorithms have been developed for deciding when and where to reschedule parallel applications that execute on multi-cluster Grids. The algorithms derive rescheduling plans that consist of potential points in application execution for rescheduling and schedules of resources for application execution between two consecutive rescheduling points. Using large number of simulations, it is shown that the rescheduling plans developed by the algorithms can lead to large decrease in application execution times when compared to executions without rescheduling on dynamic Grid resources. The rescheduling plans generated by the algorithms are also shown to be competitive when compared to the near-optimal plans generated by brute-force methods. Of the algorithms, genetic algorithm yielded the most efficient rescheduling plans with 9-12% smaller average execution times than the other algorithms.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we propose power management algorithms for maximizing the utility of energy harvesting sensors (EHS) that operate purely on the basis of energy harvested from the environment. In particular, we consider communication (i.e., transmission and reception) power management issues for EHS under an energy neutrality constraint. We also consider the fixed power loss effects of the circuitry, the battery inefficiency and its storage capacity, in the design of the algorithms. We propose a two-stage structure that exploits the inherent difference in the timescales at which the energy harvesting and channel fading processes evolve, without loss of optimality of the resulting solution. The outer stage schedules the power that can be used by an inner stage algorithm, so as to maximize the long term average utility and at the same time maintain energy neutrality. The inner stage optimizes the communication parameters to achieve maximum utility in the short-term, subject to the power constraint imposed by the outer stage. We optimize the algorithms for different transmission schemes such as the truncated channel inversion and retransmission strategies. The performance of the algorithms is illustrated via simulations using solar irradiance data, and for the case of Rayleigh fading channels. The results demonstrate the significant performance benefits that can be obtained using the proposed power management algorithms compared to the energy efficient (optimum when there is no storage) and the uniform power consumption (optimum when the battery has infinite capacity and is perfectly efficient) approaches.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present work describes the tensile flow and work hardening behavior of a high strength 7010 aluminum alloy by constitutive relations. The alloy has been hot rolled by three different cross-rolling schedules. Room temperature tensile properties have been evaluated as a function of tensile axis orientation in the as-hot rolled as well as peak aged conditions. It is found that both the Ludwigson and a generalized Voce-Bergstrom relation adequately describe the tensile flow behavior of the present alloy in all conditions compared to the Hollomon relation. The variation in the Ludwigson fitting parameter could be correlated well with the microstructural features and anisotropic contribution of strengthening precipitates in the as-rolled and peak aged conditions, respectively. The hardening rate and the saturation stress of the first Voce-Bergstrom parameter, on the other hand, depend mainly on the crystallographic texture of the specimens. It is further shown that for the peak aged specimens the uniform elongation (epsilon(u)) derived from the Ludwigson relation matches well with the measured epsilon(u) irrespective of processing and loading directions. However, the Ludwigson fit overestimates the epsilon(u) in case of the as-rolled specimens. The Hollomon fit, on the other hand, predicts well the measured epsilon(u), of the as-rolled specimens but severely underestimates the epsilon(u), for the peak aged specimens. Contrarily, both the relations significantly overestimate the UTS of the as-rolled and the peak aged specimens. The Voce-Bergstrom parameters define the slope of e Theta-sigma plots in the stage-III regime when the specimens show a classical linear decrease in hardening rate in stage-III. Further analysis of work hardening behavior throws some light on the effect of texture on the dislocation storage and dynamic recovery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we study the diversity-multiplexing-gain tradeoff (DMT) of wireless relay networks under the half-duplex constraint. It is often unclear what penalty if any, is imposed by the half-duplex constraint on the DMT of such networks. We study two classes of networks; the first class, called KPP(I) networks, is the class of networks with the relays organized in K parallel paths between the source and the destination. While we assume that there is no direct source-destination path, the K relaying paths can interfere with each other. The second class, termed as layered networks, is comprised of relays organized in layers, where links exist only between adjacent layers. We present a communication scheme based on static schedules and amplify-and-forward relaying for these networks. We also show that for KPP(I) networks with K >= 3, the proposed schemes can achieve full-duplex DMT performance, thus demonstrating that there is no performance hit on the DMT due to the half-duplex constraint. We also show that, for layered networks, a linear DMT of d(max)(1 - r)(+) between the maximum diversity d(max) and the maximum MG, r(max) = 1 is achievable. We adapt existing DMT optimal coding schemes to these networks, thus specifying the end-to-end communication strategy explicitly.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

6PANview[1] is a Wireless Sensor Network(WSN) monitoring system for 6LoWPAN/RPL networks which we developed as an overlay network for a WSN application. A monitoring system, while performing its operations for maintaining the health of the monitored network, must also be conscious of its impact on the application performance, and must strive to minimize this impact. To this end, we propose a centralized scheduling algorithm within 6PANview which non-intrusively analyzes application traffic arrival patterns at the base station, identifies network idle periods and schedules monitoring activities. The proposed algorithm finds those periodic sequences which are likely to have given rise to the pattern of arrivals seen at the base station. Parts of those sequences are then extended to coarsely predict future traffic and find epochs where low traffic is predicted, in order to schedule monitoring traffic or other activities at these times. We present simulation results for the proposed prediction and scheduling algorithm and its implementation as part of 6PANview. As an enhancement, we briefly talk about using 6PANview's overlay network architecture for distributed scheduling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider a server serving a time-slotted queued system of multiple packet-based flows, where not more than one flow can be serviced in a single time slot. The flows have exogenous packet arrivals and time-varying service rates. At each time, the server can observe instantaneous service rates for only a subset of flows ( selected from a fixed collection of observable subsets) before scheduling a flow in the subset for service. We are interested in queue length aware scheduling to keep the queues short. The limited availability of instantaneous service rate information requires the scheduler to make a careful choice of which subset of service rates to sample. We develop scheduling algorithms that use only partial service rate information from subsets of channels, and that minimize the likelihood of queue overflow in the system. Specifically, we present a new joint subset-sampling and scheduling algorithm called Max-Exp that uses only the current queue lengths to pick a subset of flows, and subsequently schedules a flow using the Exponential rule. When the collection of observable subsets is disjoint, we show that Max-Exp achieves the best exponential decay rate, among all scheduling algorithms that base their decision on the current ( or any finite past history of) system state, of the tail of the longest queue. To accomplish this, we employ novel analytical techniques for studying the performance of scheduling algorithms using partial state, which may be of independent interest. These include new sample-path large deviations results for processes obtained by non-random, predictable sampling of sequences of independent and identically distributed random variables. A consequence of these results is that scheduling with partial state information yields a rate function significantly different from scheduling with full channel information. In the special case when the observable subsets are singleton flows, i.e., when there is effectively no a priori channel state information, Max-Exp reduces to simply serving the flow with the longest queue; thus, our results show that to always serve the longest queue in the absence of any channel state information is large deviations optimal.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In metropolitan cities, public transportation service plays a vital role in mobility of people, and it has to introduce new routes more frequently due to the fast development of the city in terms of population growth and city size. Whenever there is introduction of new route or increase in frequency of buses, the nonrevenue kilometers covered by the buses increases as depot and route starting/ending points are at different places. This non-revenue kilometers or dead kilometers depends on the distance between depot and route starting point/ending point. The dead kilometers not only results in revenue loss but also results in an increase in the operating cost because of the extra kilometers covered by buses. Reduction of dead kilometers is necessary for the economic growth of the public transportation system. Therefore, in this study, the attention is focused on minimizing dead kilometers by optimizing allocation of buses to depots depending upon the shortest distance between depot and route starting/ending points. We consider also depot capacity and time period of operation during allocation of buses to ensure parking safety and proper maintenance of buses. Mathematical model is developed considering the aforementioned parameters, which is a mixed integer program, and applied to Bangalore Metropolitan Transport Corporation (BMTC) routes operating presently in order to obtain optimal bus allocation to depots. Database for dead kilometers of depots in BMTC for all the schedules are generated using the Form-4 (trip sheet) of each schedule to analyze depot-wise and division-wise dead kilometers. This study also suggests alternative locations where depots can be located to reduce dead kilometers. Copyright (C) 2015 John Wiley & Sons, Ltd.