2 resultados para RATE-VARIABILITY

em Universidad Politécnica de Madrid


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gentiana lutea L. (yellow gentian, Gentianaceae) is an important medicinal plant under protection as endangered species in most European countries. The aim of this work was to evaluate variation in seed mass, seed water content, and seed germination among 56 wild accessions of G. lutea. The effect of gibberellic acid (GA3), putrescine, moist chilling, and level of ripeness of seeds on subsequent germination was also investigated. Seeds of G. lutea showed physiological dormancy (final germination percentages ranged from 0% to 11%, depending on the accession) and GA3 enhanced seed germination drastically in all the accessions. The highest germination (99%) of GA3-treated seeds was reached at 15 °C. Final germination percentage and germination rate (as expressed by mean germination time), as well as seed mass and seed water content, varied significantly among accessions. In general, 1 year moist chilling did not significantly enhance G. lutea seed germination. For most accessions, no significant differences were found between fully ripe seeds and less ripe seeds for seed water content, seed mass, and seed germination. Applications of GA3 were always most effective than those of putrescine for increasing seed germination.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Short-term variability in the power generated by large grid-connected photovoltaic (PV) plants can negatively affect power quality and the network reliability. New grid-codes require combining the PV generator with some form of energy storage technology in order to reduce short-term PV power fluctuation. This paper proposes an effective method in order to calculate, for any PV plant size and maximum allowable ramp-rate, the maximum power and the minimum energy storage requirements alike. The general validity of this method is corroborated with extensive simulation exercises performed with real 5-s one year data of 500 kW inverters at the 38.5 MW Amaraleja (Portugal) PV plant and two other PV plants located in Navarra (Spain), at a distance of more than 660 km from Amaraleja.