Action learning through the use of enterprise resource planning system in construction management


Autoria(s): Chan, Eric W. L.
Contribuinte(s)

[Unknown]

Data(s)

01/01/2009

Resumo

Although information communication technology (ICT) tool is long regard as very useful in today’s engineering, architectural and construction management, organizations cannot just only simply operate based upon its origin, but also requires the on-going observation, controlling measures, monitoring aids, adding features and fine-tuning actions to such tool before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed “off-the-shelf-software” ICT package and customize it to suit their own requirements. Due to the incapability and inefficiency of such software and customization, the possible result is making such tool becomes not user-friendly and obsolete.<br /><br />The purpose of this paper therefore, as part of the doctoral research, is to review and report those actions taken by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system upon launching it since December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization’s “Delegation and Limits of Authority”; publishing the “League Table” amongst users; integrating the 3D Modeling into the system and adopting the “Resources Requirement Planning”.<br /><br />Whilst the ultimate goals of this system are well beyond the time limit of the research project, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth HK$5 billion after the ERP system was functioned effectively. The experience and success of this organization can be borrowed by those companies which are planning to adopt information technology (IT) strategy and use ICT tool in the architectural management system.<br />

Identificador

http://hdl.handle.net/10536/DRO/DU:30031923

Idioma(s)

eng

Publicador

CIB-W096

Relação

http://dro.deakin.edu.au/eserv/DU:30031923/chan-actionlearning-2009.pdf

http://140.116.205.15/CIB-W096_2009_Taiwan/index.php?option=com_frontpage&Itemid=1

Palavras-Chave #project management #Enterprise Resource Planning (ERP) #Information Communication Technology (ICT) #construction management
Tipo

Conference Paper