Virtual Ergonomics and Time optimization of a Railway Coach Assembly Line


Autoria(s): Marzano, Adelaide; Agyapong-Kodua, K; Ratchev, Svetan
Data(s)

2012

Resumo

The recent drive towards timely multiple product realizations has caused most Manufacturing Enterprises (MEs) to develop more flexible assembly lines supported by better manufacturing design and planning. The aim of this work is to develop a methodology which will support feasibility analyses of assembly tasks, in order to simulate either a manufacturing process or a single work-cell in which digital human models act. The methodology has been applied in a case study relating to a railway industry. Simulations were applied to help standardize the methodology and suggest new solutions for realizing ergonomic and efficient assembly processes in the railway industry.

Identificador

http://pure.qub.ac.uk/portal/en/publications/virtual-ergonomics-and-time-optimization-of-a-railway-coach-assembly-line(581e49a6-31a8-4d62-adc0-1084565a1cd6).html

http://dx.doi.org/doi:10.1016/j.procir.2012.07.095

Idioma(s)

eng

Direitos

info:eu-repo/semantics/openAccess

Fonte

Marzano , A , Agyapong-Kodua , K & Ratchev , S 2012 , ' Virtual Ergonomics and Time optimization of a Railway Coach Assembly Line ' Procedia CIRP , vol 3 , pp. 555–560 . DOI: doi:10.1016/j.procir.2012.07.095

Palavras-Chave #Work-cell assembly simulation;
Tipo

article