Determination of preventive maintenance lead time using hybrid analysis


Autoria(s): Ma, Lin; Mathew, Joseph; Sun, Yong; Zhang, Sheng
Data(s)

2005

Resumo

The time for conducting Preventive Maintenance (PM) on an asset is often determined using a predefined alarm limit based on trends of a hazard function. In this paper, the authors propose using both hazard and reliability functions to improve the accuracy of the prediction particularly when the failure characteristic of the asset whole life is modelled using different failure distributions for the different stages of the life of the asset. The proposed method is validated using simulations and case studies.

Formato

application/pdf

Identificador

http://eprints.qut.edu.au/23150/

Publicador

Wanfangdata (北京万方数据股份有限公司 )

Relação

http://eprints.qut.edu.au/23150/1/c23150.pdf

http://gjsbgcygl.periodicals.net.cn/default.html

Ma, Lin, Mathew, Joseph, Sun, Yong, & Zhang, Sheng (2005) Determination of preventive maintenance lead time using hybrid analysis. International Journal of Plant Engineering and Management (国际设备工程与管理), 10(1), pp. 13-18.

Direitos

Copyright 2005 Wanfangdata (北京万方数据股份有限公司)

Fonte

Faculty of Built Environment and Engineering

Palavras-Chave #091399 Mechanical Engineering not elsewhere classified #099999 Engineering not elsewhere classified #Preventive Maintenance, Reliability, Hazard
Tipo

Journal Article